Last bit (window rough in) wrapped up. I may want to move in once this
is finished.
Sunday, October 19, 2014
Friday, October 17, 2014
3rd wall complete...
...neat and square...or neat anyway, square is not a common term used
when working on our nearly 100yr old house. Complete minus 1 stud for
those who are checking.
when working on our nearly 100yr old house. Complete minus 1 stud for
those who are checking.
Tuesday, October 14, 2014
2 wall sections framed
...or mostly, still determining window shape and size (see gap in
studs). Snow blower/lawn mower "garage" will have a sliding door and
there will be a walk-through door at the garage end (rear of the
house). Light will be from one window, possible window in door and
electric which is already run to shed area.
studs). Snow blower/lawn mower "garage" will have a sliding door and
there will be a walk-through door at the garage end (rear of the
house). Light will be from one window, possible window in door and
electric which is already run to shed area.
Monday, October 13, 2014
Sunday, October 12, 2014
Subscribe to:
Posts (Atom)