Sunday, November 30, 2014

Less white..

Trying yellow. We'll see what it looks like with white trim.

Friday, November 21, 2014

Sunday, November 9, 2014

Shearing complete

Zip system is quite easy...in no small part due to the fastener
markings. I ended up w/less than 32 ft^2 of scrap and it comes in
4'x8' sheets so I'm doing okay.

Saturday, November 8, 2014

Sunday, October 19, 2014

Framing complete

Last bit (window rough in) wrapped up. I may want to move in once this
is finished.

4th wall

Framed including roughed in for door. Just widow rough in remains on
framing...need more lumber.

Friday, October 17, 2014

3rd wall complete...

...neat and square...or neat anyway, square is not a common term used
when working on our nearly 100yr old house. Complete minus 1 stud for
those who are checking.

Tuesday, October 14, 2014

2 wall sections framed

...or mostly, still determining window shape and size (see gap in
studs). Snow blower/lawn mower "garage" will have a sliding door and
there will be a walk-through door at the garage end (rear of the
house). Light will be from one window, possible window in door and
electric which is already run to shed area.

Saturday, September 13, 2014

Farewell

To the old (but not original) mower. After approximately 20yrs it is
off to the reusables section of the Wellesley dump. Yes,
reusables...while it is no longer self-propelled and a bit down on
power it still starts right up and works. Perhaps someone will rescue
it. If I recall correctly $480 at the time - I tidy sum but good value
over time.

Monday, September 1, 2014

Friday, August 29, 2014

Monday, July 28, 2014

Random sanding

"I need chairs" table resurfaced and ready for varnish, reclaimed
stools for garage.

Sunday, June 22, 2014

Explosion proof lights

Reclaimed US Navy ship explosion proof lights refurbished and installed.